batshonnicole
batshonnicole batshonnicole
  • 02-01-2019
  • Mathematics
contestada

Six people paint the fence and 15 hours how long would it take five workers to do the same job

Respuesta :

somaiasult2006
somaiasult2006 somaiasult2006
  • 02-01-2019
it will take 12.5 hrs for five workers to do the same job.


steps:

15 × 5 = 75

75 ÷ 6 = 12.5
Answer Link

Otras preguntas

Damage to the nerve supply of which muscle could cause the sensitivity to or distortion of noises? a. Digastric b. Platysma c. Buccinator d. Geniohyoid e. Stape
As an engineer which types of ethical issues or problem you can face in industrial environment.
Is the answer correct
1.This is used to as marker on the materials
4. In a cricket match a batsman hits of boundary 6 time out of 30 balls find the probabilitythat he hits a boundary​
what is the behavior of an element with static positioning in regard to the page layout?
Which of the following is an example of potential energy?
is 3.39 a rational number
Which of the following plots has exactly 2 clusters and 1 outlier
Help me PLEASEEEEEEEEEEEEE