lillymcginn lillymcginn
  • 02-11-2019
  • Mathematics
contestada

A lift that weighs 300N moves a man with a weight of 950N upwards by 12m. How much work is done to move the lift this height?

Respuesta :

skyluke89
skyluke89 skyluke89
  • 07-11-2019

Answer:

15,000 J

Step-by-step explanation:

Since the lift also carries the man, the total weight of the man+lift system is

[tex]F=300 N + 950 N = 1250 N[/tex]

The work done in moving the lift upward is

[tex]W=Fd[/tex]

where

F is the weight of the lift+man combined system

d is the displacement

In this problem,

F = 1250 N

d = 12 m

Substituting,

[tex]W=(1250)(12)=15,000 J[/tex]

Answer Link

Otras preguntas

what cultures influenced the Byzantines
In this diagram below,
which is the smallest number can be rounded off to 60
What conditions existed in what is today the united states that made it "fertile ground" for a great nation?
Some genetic material is wasted during?
When would slime molds likely gather to form one, large structure?
Suppose that in an? economy, investment is? $400 billion, saving is? $400 billion, tax revenues are? $500 billion, exports are? $300 billion, and imports are? $
How much ice (in grams) would have to melt to lower the temperature of 354 ml of water from 26 ?c to 6 ?c? (assume the density of water is 1.0 g/ml.)?
Find the perimeter of the triangle (-4,-2),(-3,-5) and (3,-7)
I should be able to solve this but some reasons I just can't see the steps and the right answer. Can you help me ? Thanks!