katriceervin12p8wls8 katriceervin12p8wls8
  • 02-05-2020
  • Mathematics
contestada

If it takes 12 weeks for the factory to be at full capacity, how many weeks would it take for the factory to be at half capacity?

Respuesta :

jam2282
jam2282 jam2282
  • 02-05-2020

Answer:

it takes 6 weeks fir the factory to be at half capacity

Step-by-step explanation:

half of 12 is 6

Answer Link
jojiwalt
jojiwalt jojiwalt
  • 02-05-2020

It would take 6 weeks to be at half capacity

Answer Link

Otras preguntas

The blank of an object include its color,texture,smell,taste, and ability to insulate or conduct electricity or heat​
On edge am I allowed to use notes on the final exam?
Jackie is selling smoothies at a school fair. She starts the day with $15 in her cash box to provide change to her customers. If each smoothie costs $3.75, whic
im not good with geometry
How to know that it has a high boiling point based on the question
Although her request was denied, at first Leibovitz wanted to photograph the Queen _____.
Characteristics shared by the African colonies include
Which term best describes energy transfer between tropical levels? A: average B: ineffecient C: high D:efficient
Can someone help me please
PLEASE HELP ME!!!! WILL AWARD BRAINIEST IF IT'S CORRECT!!! This newspaper reflects the increase in violence caused by A. piracy in Africa. B. terrorism in Ye