Which field can be used to track the progress on tasks that a user has created?
Subject
Start Date
Due Date
% Complete

Respuesta :

connerb333 connerb333
  • 08-07-2020
All of these are correct and what Would work best is a % Complete_ at what this would do is show a 0-100 completion rate
Answer Link
babyyyjadee babyyyjadee
  • 30-10-2020
All of them would work but the most efficient one would be % complete
Answer Link

Otras preguntas

how much simple interest would be paid on a loan of $18360 at 12% fpr 49 months
Simplify (x minus 4) (x^2 +3x + 2)
If it takes 26 hours for Jane to paint a house, and it takes 22 hours for Julie to paint the house, how long will it take them working together? (Round your ans
Monica is making a recipe that uses 5 cups of beans in 2 cups of carrots which combination below uses the same ratio of beans
Help what’s the answer
Harry is building a house with a sloping roof. If the roof is 44 feet long and 10 feet high, what is the angle that the roof makes with the horizontal?
Which feature of menu option of word processing program can you make images
Max and Jack had 86 stamps. If Max gives 36 stamps to Karl, Max and Jack would have the same number of stamps left. How many stamps does Max need to give to Jac
"what basic problem is reflected in the communication difficulties and impaired social relationships of asd children?"
Determine the overall charge on each complex. hexachloroplatinate(iv)