raazshah661 raazshah661
  • 03-09-2020
  • Mathematics
contestada

A can do a piece of work in 20 days and B can do it in 12 days,B work for 9 days,in how many days A alone can do the work​

Respuesta :

roseheart889 roseheart889
  • 03-09-2020

Answer: 9

Step-by-step explanation:

Answer Link

Otras preguntas

What is the value of X? Enter your answer as a decimal in the box. Round only your final answer to the nearest 10th.
2 (-4x + 3) - 7x = 6x -7
ASAPJasper works as an inspector at a factory that makes polo shirts. He has found that the theoretical probability of a shirt that is produced being defective
In the story, the highway symbolizes a A. goal. B. path. C. barrier. D. process.
What is the i.u.p.a.c. name of the organic acid produced by oxidation of ethanol?
What issue was at the root of the nullification crisis?
Which natural resource is formed from the deposition of sedimentary rocks? -slate - copper - gold -coal - gas
When the Greeks were driven back to the sea by the Trojan army, what did Agamemnon decide to do? Fight to the death no matter what. Sail home before they were a
Polygon ABCDEF is the result of a translation of polygon GHIJKL . GH¯¯¯¯¯¯ is parallel to LK¯¯¯¯¯ in the pre-image. Drag the answers to the boxes to correctly c
What was the goal of the neutrality of acts of the 1930s