how do you find the mean completion time of a PERT network diagram?​

Respuesta :

okekesarah01642112
okekesarah01642112 okekesarah01642112
  • 02-01-2021

Answer:

PERT is an estimating technique that uses a weighted average of three numbers (see below) to come up with a final estimate. The resulting PERT estimate is calculated as (O + 4M + P)/6. This is called a "weighted average" since the most likely estimate is weighted four times as much as the other two values.

Answer Link

Otras preguntas

list some potential problems for a person who is deficient in calcium
The graph below represents the path of a grasshopper as it jumps. Which type of function is modeled by the data on the graph?
What is global warming? What can people do to reduce it?
Which transformation is a rotation?
Describe some of the ways that alcohol reaches every member of a community
This artistic representation of metalworking, which show the creativity and versatility that can be achieved with metal, is entitled, _____________. a. Torso o
Write a short paragraph about how to prevent yourselves against different crimes....
I need help with question 1
A semiconductor can be made by adding atoms of other elements to a. aluminum. b. steel. c. silicon. d. zinc.
What are the causes of problems the Maya’s and other native Americans groups face in Guatemala?How are people trying to solve these problems