Q11.
It takes 3 painters 2 days to complete a job. Work out how long 1 painter would take.

Respuesta :

26liujiaying
26liujiaying 26liujiaying
  • 03-02-2021

Answer:

6

Step-by-step explanation:

1 painter is 1/3 of 3 painters, so the answer is 2 x 3=6

Hope I helped!

Answer Link

Otras preguntas

The best safety feature for preventing whip flash is the airbag ?
If the mass of a material is 82 grams and the volume of the material is 23 cm3, what would the density of the material be?
What is the article of confederation
Find all solutions to the equation. (sin x)(cos x) = 0
Jim has three times as many comic books as Charles. Charles has 2/3 as many books as Bob. Bob has 27 books. How many comic books does Jim have?
which of the following is a plant-like species found living on rocky shores? limpets barnacles sea squirts seaweed
Chang knows one side of a triangle is 13 cm. Which set of two sides is possible for the lengths of the other two sides of this triangle?
Does the measure of the angle get larger as it's rays get longer ?
i think the answer is D ...
Use the graph below to answer the question. What process is occurring during section "B" of the above graph? A. condensation B. melting C. freezing D. va