ridume2020 ridume2020
  • 02-01-2024
  • Mathematics
contestada

Montu finishes a piece of work in 24 days. How much work will he complete in 8 days?​

Respuesta :

ahmedmaham984
ahmedmaham984 ahmedmaham984
  • 02-01-2024

Answer:

Therefore, he will complete 1/3 of the work in 8 days as 24 ÷ 8 = 3.

Answer Link

Otras preguntas

What element in the fourth period is an exception to the Aufbau principle?
"What is the name of the ray that is opposite of ray BA? "
assign icd-10-cm code(s) for the following case: the physician sent blood for hiv testing: the patient complain of fever weight loss.
In right triangle ABC, ∠A and ∠B are complementary angles and sin A = 89. What is cos B?
Sedimentary rocks are useful as records of past time because of _____.
In what way(s) did the Hongwu Emperor work to improve the lives of Chinese peasants?
Which type of verb typically includes the word "to"
what are the costs and consequences of providing and to whom
you dont really approve of the idea of political parties however youre known as a federalist and are soon associated with that party. chances are good that your
What makes the steps of foot over bridge at railway station to wear out slowly?